Verigy 93k Tester Manual Jun 2026
Automated Test Equipment (ATE) is the backbone of the semiconductor manufacturing industry. Among the most enduring and widely deployed platforms in this space is the , originally developed by Hewlett-Packard/Agilent, later spun off as Verigy, and currently maintained and expanded by Advantest.
For technical support, calibration, or repair services, contact:
Select the specific vector burst compiled for that functional block.
For power management ICs, the manual explains HV pin electronics that can drive up to 40V without damaging standard 3.3V pins. verigy 93k tester manual
The fundamental manual describing the Graphical User Interface (GUI), configuration tools, and workspace management.
93k Tester 02 Hardware Overview Rev.7.2.2.A.00 | PDF - Scribd
The Verigy 93000 utilizes a highly scalable, "tester-per-pin" architecture. This means every individual pin on the tester operates independently with its own dedicated resources, maximizing flexibility and minimizing test times. Key Hardware Components Automated Test Equipment (ATE) is the backbone of
SmarTest is the comprehensive software environment for programming and operating the 93K, and mastering its manuals is non-negotiable for efficient test development. The most current version is , which features a modern user interface. Key software tools you will find documented include:
Building a test program on the 93K is a structured process, well-documented in the system’s "Test Program Development" guides. The flow generally follows these steps:
The manual typically divides the system into several key components: Running the SmarTest software environment. For power management ICs, the manual explains HV
The Verigy 93K tester provides various data analysis and storage features, including:
Searching for "Verigy 93K tester manual PDF" can lead to scattered results, but the primary source is your official Advantest documentation package. The is the definitive source for all manuals. For those without access to the TDC, old archived PDFs from the Verigy era (editions as old as 5.4 from June 2006) exist in places like the CSDN and GitCode repositories. However, always prioritize the official, up-to-date documentation from Advantest or your employer’s internal knowledge base to ensure you're referencing the correct procedures for your specific system revision.
How to initialize the system and load SmarTest. 2.2 Hardware Reference Manual (Testhead) This manual details the physical components of the V93000:
Determine the routing behavior based on the test outcome. For instance, if the test fails, route the flow directly to a Hard Bin (e.g., Bin 5: Functional Fail ) to optimize test time. 4. Troubleshooting, Calibration, and Diagnostic Routines